Our service engineers are always available to provide service on any of
our products, ranging from overhauls to full installation for new buildings or
retro-fits.
This
propeller shaft picked up a re-inforced rubber hose (probably originally used
for bunkering).
The vessel was taken above a sandbank at high tide. At low
tide our service engineers opened the seal, re-jointed all butt joints, replaced
all O-rings and joints, refitted the seal and the vessel returned to service at
the next high tide.
